Installation checklist
Run through this list before you climb the bin.
Site
- Cell signal verified at the bin (one bar minimum on any carrier)
- Solar panel will face south with no all-day shade
- Roof port or sensor cable entry available
- Bin is grounded and bonded to the rest of the yard
Hardware
- Chester X1 with serial number recorded
- Mounting bracket and stainless hardware
- Sensor cable of correct length (allow 0.5 m of slack at the top)
- Cable strain relief / bushing for the roof port
Software
- GrainLink account created and location defined
- Bin added to the location with grain type and capacity
- Device ID ready to pair
- On-site technician has the dashboard open on their phone
After power-on
- Status LED solid green within 5 minutes
- Readings appear in the dashboard
- Sensor cable readings are within 2°C of ambient (sanity check)
- Photo of the install saved to the bin’s Notes tab